Governors Park · Bellefonte, Pennsylvania

Help Us Bring
Kepler Pool
Back to Life

A beloved community landmark has been closed since 2020. With your help, it will thrive again, bigger, safer, and better than ever.

Make a Donation Our Story
Closed since 2020 · Construction to begin 2026 · Opening 2027
53
Years Serving the Community
$3M+
Raised Through Grants
4
Partner Municipalities
6 yrs
Planning for the new Kepler Pool

Over 50 Years of Summer Memories

When residents of Bellefonte rallied together in the late 1960s to build a community pool, they weren't just raising money. They were building something for the generations that would follow. The Robert Kepler Memorial Pool opened in Governors Park in 1971, and for decades it was the heartbeat of summer in Centre County.

Families packed the deck on hot afternoons. The YMCA Bellefonte Sting Rays held their summer practices and meets here. Teenagers found a safe, fun place to spend warm evenings. Birthday parties, first swimming lessons, lazy Saturdays with friends. Kepler Pool was where those memories were made.

After decades of heavy use and limited upgrades, the pool closed in 2020 due to mechanical failures too costly to simply patch again. The children's wading pool had already been shuttered from disrepair. The community that built this pool together now has the chance to save it, together.

"Just the thought of seeing laughter and music and kids and families at that pool again would be a huge asset for the community."

— Mayor Buddy Johnson, Bellefonte Borough

See the Full Plan

The Nittany Valley Joint Recreation Authority (NVJRA) and PennTerra Engineering walk through the complete renovation vision for Kepler Pool.

Not Just Restored — Reimagined

The renovation plan goes far beyond repairs. Kepler Pool will come back as a modern, accessible, family-friendly destination that will serve the region for generations to come.

Phase 1

Larger Competition Pool

The main swimming pool will be replaced and enlarged to support competitive swim meets, lap swimming, and open recreation — serving all ages and ability levels.

Phase 1

Concessions & Accessibility

A refreshed concession stand, re-graded and expanded parking, improved lighting, and updated site infrastructure will make the entire facility more welcoming and accessible.

Phase 1

New Filtration Systems

Completely updated mechanical and filtration systems replace the aging equipment that caused the 2020 closure — designed for reliability and lower long-term operating costs.

Phase 2

Safe Children's Area

A brand-new, age-appropriate wading area will replace the long-shuttered children's pool, giving families with young kids a safe and welcoming place to play.

Stretch Goal

Phase 2

Splash Pad Feature

With enough community donations, the vision includes adding a splash pad — a free-access water play area that would draw visitors and make Kepler Pool a true regional destination.

Phase 3

Modern Bath House

Updated locker rooms, restrooms, and shower facilities will be rebuilt to meet today's safety and accessibility standards — a complete overhaul from the ground up.

Phase 1 is Now Funded.
You Can Help Us Build the Rest.

After years of the NVJRA board and volunteers working hard to secure grants and a final push to close a $398,000 funding gap with municipal support, Phase 1: the main competition pool and all core systems, will be fully funded. Community donations now go directly toward Phase 2: the children's wading pool and splash pad.

$4.5M
total project budget
$1.6M
Phase 2 community goal
$1.475M · DCNR Grant (2024)
$398K · Municipal Pledges (Dec 2025)
$184K · Commonwealth Financing Authority
$200K · Local Share Account Grant

Donations through Nittany Valley Recreation Inc. are tax-deductible. NVRI is a registered 501(c)(3) nonprofit organization.

A Long Road,
With a Clear Destination

1971

Kepler Pool Opens

After a community-led fundraising campaign, the Robert Kepler Memorial Pool opens in Governors Park — a gift from one generation to the next.

2020

Pool Closes Due to Mechanical Failure

Decades of use catch up with the aging facility. The Nittany Valley Joint Recreation Authority begins planning a comprehensive renovation.

2022

Grants & Design Work Begin

NVJRA works to secure over $3M in funding. PennTerra Engineering and Clearwater Pool Company are engaged to design the new pool. A new nonprofit, Nittany Valley Recreation Inc., launches the community fundraising campaign.

2025

Final Hurdle Cleared

After several years of planning work, all four member municipalities — Bellefonte Borough, Spring, Benner, and Walker townships — commit their pledges, closing a $398,000 funding gap. Phase 1 is fully funded.

2026

Construction to Begin

The main competition pool, all new systems, decking, and site infrastructure will be rebuilt from the ground up. Your donations are funding what comes next.

2027

Opening Day

Laughter, splashing, swim meets, summer jobs, and birthday parties — the sounds of Kepler Pool are coming back. Be part of making the full vision a reality.

Kepler Pool in the News